Description
Premium SCART 1.5m Cable Lead Fully Wired 21 Pin RGB SKY TV DVD
Brand New SCART cable with Silver plated connectors for improved conductivity.
The SCART can be used for connecting two audio / visual devices together For Example VCR’s, TV’s, DVD players, Sky etc.
Features:
- 21 pin Male to 21 pin Male
- Silver Plated Connectors
- Length Available: 1.5m
- Brand New
- Colour: Black
- 2 x 21 pin male connectors
- Multiple screened cable for maximum signal fidelity
- Copper clad steel for high strength and good quality signal transfer
What is included:
- 1x SCART 1.5m Cable Lead